If you own or run a construction company, you will no doubt be aware of the Construction (Design and Management) Regulations 2015 (CDM 2015). Our blog this month provides clarity on the basics of what you need to know. 
 
According to the HSE “a principal contractor (PC) is the contractor with control over the construction phase of a project involving more than one contractor. They are appointed as early as possible by the client (commercial or domestic), before construction starts, to plan, manage, monitor and coordinate health and safety during this phase”. 
 
A principal contractor cooperates closely with the client and the principal designer and influences how the risks to health and safety are managed during the construction project. The PC ensures that requirements are understood and implemented. To do this the PC should: 
CDM stands for Construction Design and Management Regulations 2015 and not Cadbury’s Dairy Milk! 
CDM 2015 applies to all construction work which means the carrying out of any building, civil engineering or engineering construction work. 
Who are the duty Holders under the CDM 2015 regulations? 
1. Clients are organisations or individuals for whom a commercial construction project is carried out and have control of the decisions relating to the build. They must; 
a. Appoint a Principal Designer and Principal Contractor in writing or accept their duties themselves and assess their competence; 
b. ensure an F10 notification is submitted to the HSE, if the project is over 500 person days or over 30 days with more than 20 persons on site at any one time; 
c. Ensure suitable welfare facilities are in place from day 1 of construction 
d. provide Pre-Construction Information (PCI) to every designer and contractor appointed 
e. before the construction phase begins, a Construction Phase Plan (CPP) is in place 
f. a Health and Safety File for the project is prepared when construction is complete 
Construction company, Sir Robert McAlpine Ltd was sentenced for safety breaches after worker, Mark Smith, fell 4.8 metres via an unprotected opening. 
Leeds Magistrates’ Court heard how, on 28 April 2016, Mr Smith, aged 36, was working at Stone Gappe Hall, Lothersdale, Keighley, owned by Richard McAlpine, a director of the McAlpine team of companies. Mr Smith was attaching straps to a water tank while preparing to pass it to a decrease flooring of a water tower at the property, in order to paint the floor. 
 
An investigation by the Health and Safety Executive (HSE) observed that Mr Smith fell through an opening that did not have fixed aspect protection. As a result, he sustained serious injuries including: a tibial shaft fracture, a distal fibular fracture, a fracture to the left patella, orbital and nasal fractures, lacerations to the face, a concessional head injury, damage to his ribs and he was hospitalised for 9 days.  
 