CDM stands for Construction Design and Management Regulations 2015 and not Cadbury’s Dairy Milk! 
CDM 2015 applies to all construction work which means the carrying out of any building, civil engineering or engineering construction work. 
Who are the duty Holders under the CDM 2015 regulations? 
1. Clients are organisations or individuals for whom a commercial construction project is carried out and have control of the decisions relating to the build. They must; 
a. Appoint a Principal Designer and Principal Contractor in writing or accept their duties themselves and assess their competence; 
b. ensure an F10 notification is submitted to the HSE, if the project is over 500 person days or over 30 days with more than 20 persons on site at any one time; 
c. Ensure suitable welfare facilities are in place from day 1 of construction 
d. provide Pre-Construction Information (PCI) to every designer and contractor appointed 
e. before the construction phase begins, a Construction Phase Plan (CPP) is in place 
f. a Health and Safety File for the project is prepared when construction is complete 
Construction company, Sir Robert McAlpine Ltd was sentenced for safety breaches after worker, Mark Smith, fell 4.8 metres via an unprotected opening. 
Leeds Magistrates’ Court heard how, on 28 April 2016, Mr Smith, aged 36, was working at Stone Gappe Hall, Lothersdale, Keighley, owned by Richard McAlpine, a director of the McAlpine team of companies. Mr Smith was attaching straps to a water tank while preparing to pass it to a decrease flooring of a water tower at the property, in order to paint the floor. 
 
An investigation by the Health and Safety Executive (HSE) observed that Mr Smith fell through an opening that did not have fixed aspect protection. As a result, he sustained serious injuries including: a tibial shaft fracture, a distal fibular fracture, a fracture to the left patella, orbital and nasal fractures, lacerations to the face, a concessional head injury, damage to his ribs and he was hospitalised for 9 days.  
 
The festive season is finally here, and many sites are closing to celebrate Christmas through to the new year. But before you leave to enjoy the festivities and a well-earned break, there are a few things you need to get into order. 
Even when your site is inactive, you still hold a duty of care, in order to keep the general public safe. 
This checklist will help you minimise any risks posed during the break by ensuring your site is as secure as possible, during your time away: 
Check your fencing 
You need to define your site boundaries, with the use of suitable fencing; this should reflect the nature of the site and the surrounding areas. Take a quick walk round your site to ensure that fencing is secure and undamaged. Children (and thieves) will often enter construction sites during quiet periods, and the best way to keep them safe from injury is to keep them out. 